Connecting the Energ ySmart Dr yer
Control to System Components
(continued)
4
Route the control system inter-connecting and communications inter-con-
necting wires from the EnergySmart Dryer electrical panel to the
GasTrac electrical panel.
5
If not using conduit, insert the control system inter-connecting and the
communication inter-connecting wires through their respected entry
port.
Secure the wires with an appropriately-sized strain relief.
6
Connect the control system inter-connecting wiring of the GasTrac to the
EnergySmart Dryer electrical panel
as detailed in the supplied wiring dia-
gram.
7
Connect the communication inter-connecting wire of the GasTrac to the
EnergySmart Dryer electrical panel
as detailed in the supplied wiring dia-
gram.
8
If not using conduit, determine the location of the entry port in the
GasTrac’s electrical enclosure for the control system inter-connecting and
the communication inter-connecting wires.
9
If not using conduit, drill or cut the entry ports,
one for the inter-connect-
ing wire and one for the communication inter-connecting wire.
10
If not using conduit, insert the control system inter-connecting and the
communications inter-connecting wires for the GasTrac through their
respected entry ports on the GasTrac’s electrical enclosure.
Secure the
wires with an appropriately-sized strain relief.
11
Connect the control system inter-connecting wires to the GasTrac’s
electrical panel
as detailed in the supplied wiring diagram.
12
Connect the communication inter-connecting wire to the GasTrac’s
electrical panel
as detailed in the supplied wiring diagram.
ON
O
O
FF
3
In
st
al
la
tio
n
I n s t a l l a t i o n - C o n t r o l & C o m m u n i c a t i o n W i r i n g l
3-77
IMPORTANT:
Always refer
to the wiring diagrams
that came with your
EnergySmart Dryer and
GasTrac before making
electrical connections.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...