Installing the CH Hopper Door,
Upper and Lid Sections
(continued)
Hopper Lid Section
IMPORTANT:
Improper mounting of the hopper lid will cause interference when
installing the DM-II monitor probe and optional integrated cyclone. See the illustra-
tion below for recommended hopper lid mounting locations.
To install the hopper lid section of the CH Hopper:
1
Apply sealer around the lip on the top of the hopper door or hopper upper
section, if applicable.
2
Using a forklift, hoist or crane, lift the hopper lid section assembly above
the hopper door or hopper upper section.
3
Set the hopper lid section on the hopper door or hopper upper section as
shown below.
As the hopper lid section is positioned on the hopper door or
hopper upper section, make sure the holes in the hopper lid section align with
the holes in the hopper door or hopper upper section.
4
Secure the hopper lid section to the hopper door or hopper upper section
using the supplied hardware.
CAUTION:
To prevent accident and injury, lift the hopper lid section onto the hopper
door or hopper upper sections using a forklift, hoist or crane.
NOTE:
When applying the sealer,
do not cover the holes in the
upper section lip. Apply the sealer
around the holes so you will have
a good seal but not interfere with
the mounting hardware that will
be used to secure the hopper lid
section to the hopper upper
section.
✐
✒
TIP:
Conair recommends applying
strip and stick sealer 1/8 inches
{3.2 mm} from the inside to the
edge of the CH Hopper.
WARNING:
To accomplish the
following steps, it may be nec-
essary for personnel to enter the
CH Hopper assembly. If it is
necessary to enter the hopper
assembly, all applicable OSHA
procedures for working within
a confined space
MUST BE
followed.
3-16
l I n s t a l l a t i o n - G e n e r a l
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...