4-72
l O p e r a t i o n
Stopping the Energ ySmart Dr yer
System
(continued)
To stop the EnergySmart Dryer System using “System Cool down”:
1
Stop the processing machine and stop taking material out of the hopper.
2
Navigate to the System Control Screen (Screen 8).
3
Press the "System Cool down" button on the System Control Screen
(Screen 8.)
When the System Cool down function is used, the heater (HTC or GasTrac) will
immediately be turned off. The blower in the EnergySmart Dryer regen circuit will
continue to run for the amount of time set in the System Cool down timer. The
time can be set from 1 to 24 hours. If equipped, the temperature probe option can
be selected for the Cool Down function.
4
Disconnect and lock out the main power
if you have stopped the system to per-
form maintenance or repair.
NOTE:
If the operator presses
the “Stop System” button and
then decides use the System
Cool down Function, the
“System Start” button will
have to be pressed, then the
“System Cool down” button.
✐
ON
O
O
FF
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...