O p e r a t i o n l
4-71
4
O
p
er
at
io
n
CAUTION:
Improper
shutdown can cause
damage to the
EnergySmart Dryer
System and its com-
ponents.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper security
level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used to
change the setpoint.
See Operation
section entitled, Example Set Point
Change.
After the new setpoint
value has been entered, press the
"Enter"
key to lock in the new set-
point.
✐
NOTE:
The material inside the dry-
ing hopper will remain hot. If this
system will be off for a long period
of time, you may want to initiate a
“System Cool Down.”
✐
(continued)
Stopping the Energ ySmart Dr yer
System
There are three (3) ways to stop the EnergySmart Dryer System from the
EnergySmart Dryer:
•
Pressing the “Stop System” button
•
Pressing the “System Cool down” button
•
Pressing the Emergency Stop switch
To stop the EnergySmart Dryer System using “System Stop”:
1
Stop the processing machine and stop taking material out of the hopper.
2
Navigate to the System Control Screen (Screen 8).
3
Press the "System Stop" button on the System Control Screen
(Screen 8).
When the Stop System function is used, the heater (HTC or GasTrac) will immedi-
ately be turned off. The blower in the EnergySmart Dryer will continue to run
until the air entering the CH hopper cools to 150°F {65.6°C} or until the ten (10)
minute timer has expired.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...