![Conair HTC 120 Скачать руководство пользователя страница 73](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067073.webp)
Installing the Dwyer 641 Air
Velocity Transmitter
(continued)
3
Screw the compression fitting into the customer-supplied pipe.
4
Orient the air velocity probe so that the flow direction arrow stamped on
the NUT used to secure the transmitter is pointing in the direction of the
air flow.
The arrow is located on the nut below the conduit bodies.
5
Center in pipe.
This will allow you to adjust the air velocity probe in the cen-
ter of the air stream.
Air Flow Direction
Arrows Located
on the Nut
3
In
st
al
la
tio
n
I n s t a l l a t i o n - P i p i n g / H o s e s l
3-43
NOTE:
Refer to Dwyer 641
Instructions found in the
Appendix of this manual.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...