![Conair HTC 120 Скачать руководство пользователя страница 188](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067188.webp)
4-46
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 31 - OptiMizer™ Setup Screen
To access the OptiMizer™ Setup Screen (Screen 31):
1
Press the "OptiMizer™” button
located on the Equipment Setup Screen
(Screen 20).
The OptiMizer™ Setup screen allows the user to set the Maximum Material
Temperature, Material Temperature Target, small temperature band, and Quick-Up
band. Each temperature setting is material specific, consult your material supplier for
the recommended Material Temperature Target and Maximum Material Temperature
setpoints.
The temperature band settings are deviation values above or below the Material
Temperature Target Set points.
See Operation section entitled, Using the OptiMizer™.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper security
level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used to
change the setpoint.
See Operation
section entitled, Example Set Point
Change.
After the new setpoint
value has been entered, press the
"Enter"
key to lock in the new set-
point.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...