Cleaning the Process Filter
Clogged filters reduce air flow and dryer efficiency. Cleaning frequency depends
on how much material you process and how dusty or full of fines it is.
1
Remove the four (4) filter cap cover
latches
, then pull the filter cap off.
2
Remove the filter wing nut,
then
remove the filter.
3
Clean the filter by laying it on its
side and gently tapping it on the
floor.
Replace damaged, worn, or
clogged filters.
4
Reverse the procedure to reinstall
the process filter.
Ensure that the
gasket on filter cap is in place and
in good condition.
CAUTION: Hot surfaces.
Always protect yourself from
hot surfaces inside and out-
side the dryer and drying
hopper.
CAUTION: Wear eye protec-
tion.
If you use compressed air
to clean the equipment,
you
must wear eye protection
and
observe all OSHA and other
safety regulations pertaining to
the use of compressed air.
TIP:
If gasket on the process filter
cap becomes loose or detached
from the filter cap, resecure with
high temperature silicone adhesive.
✒
Process Fitter Cap Latch (4)
Replacement process filters are
available from Conair.
Contact Conair Parts
(800) 458 1960
From outside of the
United States, call:
(814) 437 6861
M a i n t e n a n c e l
5-17
5
M
ai
n
te
n
an
ce
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...