3
In
st
al
la
tio
n
Installing the Receiver(s)
(optional)
If a receiver is to be mounted to the top of the CH Hopper, auxiliary hopper or
machine throat, follow the installation instructions, specifications and wiring
diagrams supplied with the receiver. Also refer to the receiver's installation
instructions and operations manual for power, level switch and compressed air
connections/specifications.
Installing the Purge Valve(s)
(optional)
If a purge valve is to be mounted to the bottom of the CH Hopper or auxiliary hop-
per follow the installation instructions, specifications, and wiring diagrams sup-
plied with the valve. Also refer to the purge valve's installation instructions and
operations manual for power, compressed air connections/specifications.
Installing the Modular Distribution
Box(es)
(optional)
If a modular distribution box is to be mounted to the bottom of the CH Hopper or
auxiliary hopper follow the installation instructions, specifications, and wiring dia-
grams supplied with the box. Also refer to the modular distribution box's installa-
tion instructions and operations manual compressed air connections/specifications.
I n s t a l l a t i o n - G e n e r a l l
3-25
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...