4
O
p
er
at
io
n
O p e r a t i o n l
4-87
Using the OptiMizer™
(continued)
OptiMizer™ Input Selection Setup Screen
The OptiMizer™ Input Selection Setup screen is used to enter the Machine Run
Selection information into the controller and enable/disable the Material
Temperature Averaging. Due to the nature of the resin flow, the material tempera-
ture measured by the Conair RTD probe at the IMM or extruder throat tends to
fluctuate greatly. The Material Temperature Averaging, when enabled, smoothes
out the temperature signal from the Conair RTD probe. The Machine Run
Selection is how the OptiMizer™ determines when the extruder or molding
machine is running and material is being used. Graphs that illustrate how the
OptiMizer™ uses each selection to determine material usage is shown below.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...