Positioning the Dr yer on the Floor
To position the dryer:
1
Lift the dryer from the shipping container
using a fork truck.
2
Position the dryer on the floor near the CH Hopper.
Make sure the location
allows easy connection to the heat source (HTC or GasTrac), water connections
and to the outlet of the optional dust collector.
Remo ving the Cable Tie from the
Desiccant Wheel
(W600-1000 models)
The EnergySmart Dryer’s desiccant wheel cable tie must be removed while
installing the dryer.
To remove the cable tie:
1
Open the dryer side panels and remove the cable tie securing the desiccant
wheel,
if it was not done while unpacking the dryer.
Installing the Regeneration
Exhaust Co ver
The EnergySmart Dryer’s regeneration exhaust cover must be installed before
using the dryer.
To install the regeneration exhaust cover:
1
Remove the exhaust cover that is attached to the dryer’s shipping pallet.
2
Locate the bolt pattern on the top of the dryer
, over top of the regeneration
exhaust outlet.
3
Position the regeneration exhaust cover over top of the regeneration
exhaust outlet
, aligning both bolt patterns.
4
Secure the regeneration exhaust cover with supplied hardware
, using an
appropriately-sized wrench.
✒
Desiccant Cable Tie
Regeneration
Exhaust Cover
I n s t a l l a t i o n - G e n e r a l l
3-31
3
In
st
al
la
tio
n
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...