Checking the Dew Point
Conair recommends monitoring the dew point performance of your dryer periodi-
cally with a calibrated portable dew point monitor, to ensure it is performing at
maximum capacity. Even if your dryer has a dew point readout, comparing it
to a portable instrument periodically will confirm that the dew point sensor and
readout is performing properly.
To check dew point:
1
Connect your portable dew point meter to the dew point check port of the
dryer.
2
Turn on the portable instrument,
and ensure
there is positive air flow through the sensor.
✐
NOTE:
Portable dew point
monitors purchased from Conair
are provided with a male
connector that plugs into the
dew point check port. If you
purchased your portable
instrument elsewhere, the male
connector is available through
the Conair parts department.
NOTE:
The dew point check port
was not included on the initial
release of these dryers. It can
be added easily. Contact the
Conair parts department or
follow the alternate procedure.
✐
Replacement dew point
monitors, male connectors
and dew point check ports
are available from Conair.
Contact Conair Parts
(800) 458 1960
From outside of the
United States, call:
(814) 437 6861
5-30
l M a i n t e n a n c e
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...