4
O
p
er
at
io
n
O p e r a t i o n l
4-67
Starting the Energ ySmart Dr yer
System
With OptiMizer
TM
Mode
To start the EnergySmart Dryer System:
1
Turn on the main power to the EnergySmart Dryer and system compo-
nents.
Check to ensure that the all disconnect dials are in the "On" or “
I
”
position.
2
Fill the drying hopper with material
by navigating the System Overview
Screen (Screen 2) and pressing the optional receiver's magnifying glass icon.
Once at the Primary Loader Screen (Screen 5), set the receiver’s load time,
dump time and purge times and press the “Enable” button to start loading the
CH Hopper.
2b
If not using the loading function, fill the CH Hopper with material.
3
Navigate to the Recipe Screen (Screen 15) within the dryer’s control.
4
Select a recipe that has been configured for your material.
When using the
EnergySmart Dryer for the first time a default recipe will be the only recipe
that can be selected.
5
View the recipe and adjust any settings that are required for your
material.
See Operation section entitled, Using the OptiMizer™.
ON
O
O
F
F
(continued)
NOTE:
You may download recipes
to use and store.
✐
NOTE:
The factory setting for set-
point is 350
°F.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...