3
In
st
al
la
tio
n
Location and Mounting of the
GasTrac Heater (if equipped)
The GasTrac supplied with the EnergySmart Dryer System is designed to be
mounted to the floor near the CH Hopper air inlet.
1
Using a forklift, hoist or crane, move the GasTrac to its installation
location near the air inlet of the CH Hopper.
CAUTION:
To prevent accident and injury, move the GasTrac to its location by using
a forklift, hoist or crane.
2
Position the GasTrac so that the gas, main power supply and exhaust flue
can be connected easily.
I
MPORTANT:
You will need to consider the location of the CH Hopper’s delivery air
inlet and the dryer installation location to properly install the GasTrac.
3
Secure the GasTrac to the mounting location floor using the holes in the
base of the GasTrac.
Check to ensure that the mounting method meets all
local, regional and national codes and regulations.
NOTE:
Electrical, control, air flow, gas and exhaust flue connections to the GasTrac will
be covered later in the installation process.
✐
I n s t a l l a t i o n - G e n e r a l l
3-27
✐
NOTE:
If your system has electri-
cal heaters, for the drying sys-
tem heat source,
see Installation
section entitled, Location and
Mounting of the HTC.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...