![Conair HTC 120 Скачать руководство пользователя страница 237](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067237.webp)
4
O
p
er
at
io
n
O p e r a t i o n l
4-95
Using the OptiMizer™
(continued)
OptiMizer™ Dry Air Temperature Setup Screen
The OptiMizer™ Dry Air Temperature Setup screen shows all of the setpoints for
the Delivery Air Temperature when the OptiMizer™ function is running. These
setpoints are used during the Tune Up/Down mode of operation.
OptiMizer™ Dry Air Airflow Setup Screen
The OptiMizer™ Dry Air Airflow Setup screen shows all of the setpoints for the
airflow when the OptiMizer™ function is running. These setpoints are used dur-
ing the Tune Up/Down mode of operation. The minimum and maximum airflow
setpoints are based on the dryer and hopper models. Typically these are the only
values that may require adjustment. Adjustment of the minimum and maximum
airflow setpoints is described later in this manual.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...