4-33
Control Function Descriptions
(continued)
Screen 18 -Secondary Hopper Loader Screen (optional)
To access the Secondary Hopper Loader Screen (Screen 18):
1
Press the "Secondary Loader" button
located on the right side of the screen.
The Secondary Hopper Loader screen allows the user to set the load time, dump time,
purge time and alarm checks of the optional receiver. If the user is logged-in at the
proper security level, these settings can be changed from this screen.
See specific
receiver’s manual for correct settings of these parameters.
Once the correct times
have been entered, press the “Enabled” button to activate the optional secondary
receiver. Pressing the “Disabled” button will de-activate the receiver. The receiver’s
current status will be displayed under the receiver’s icon in the top left side of this
screen.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper securi-
ty level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used
to change the setpoint.
See
Operation section entitled,
Example Set Point Change.
After
the new setpoint value has been
entered, press the
"Enter"
key to
lock in the new setpoint.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...