Installing the CH Hopper Door,
Upper and Lid Sections
I
MPORTANT: Before installing
the hopper door, upper (if applicable), and
lid sections of the CH Hopper,
careful consideration should be given to
the following:
•
When installing the hopper door section, make sure the hopper door is posi-
tioned to allow easy access into the hopper to aid in installation and to facilitate
hopper cleaning and maintenance in the future.
•
When installing the hopper lid section, make sure to identify the location of the
hopper’s return air outlet. The lid section has multiple piping options that can be
connected to an optional cyclone or traditional CH Hopper outlet, then to an
optional dust collector and finally to the dryer’s return air inlet. Consider all pip-
ing/hosing possibilities when installing the dryer, heater (gas or electric), optional
dust collector and optional cyclone before making the installation permanent.
Hopper Door Section
To install the hopper door section of the CH Hopper:
1
Apply sealer around the lip on the top of the cone section.
2
Using a forklift, hoist or crane, lift the hopper door section assembly above
the cone section.
CAUTION:
To prevent accident and injury, lift the hopper door section onto the
cone section using a forklift, hoist or crane.
NOTE:
When applying the sealer,
do not cover the holes in the cone
section lip. Apply the sealer
around the holes so you will have
a good seal but not interfere with
the mounting hardware that will
be used to secure the hopper
door section to the cone section.
✐
✒
TIP:
Conair recommends applying
strip and stick sealer 1/8 inches
{3.2 mm} from the inside to the
edge of the CH Hopper.
NOTE:
When installing the hopper
door section, make sure the hop-
per door is positioned to allow
easy access into the hopper to
aid in the continuing installation
and to facilitate hopper cleaning
and maintenance in the future.
✐
I n s t a l l a t i o n - G e n e r a l l
3-13
3
In
st
al
la
tio
n
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...