4-36
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 21 -Dehumidified Air Circuit Setup Screen
To access the Dehumidified Air Circuit Setup Screen (Screen 21):
1
Press the "Dry Air Setup” button
located on the Equipment Setup Screen
(Screen 20).
From the Dehumidified Air Circuit Setup screen, the user can select the dryer model
type the control is currently configured to use, the type of heat booster used in the
EnergySmart Dryer System (none, GasTrac, or Electric), the dryer cool down method,
model number of the heat booster and the dryer model number.
To configure the EnergySmart Dryer System:
1
Use the up and down arrow buttons to make the appropriate selection.
The
current selection will be indicated by a yellow triangle.
2
Press the “Enter” button to lock in the current selection.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
(continued)
NOTE:
Configuration should
be completed at the factory
prior to shipping.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...