4-94
l O p e r a t i o n
Using the OptiMizer™
(continued)
OptiMizer™ Pre-dry Setup Screen
The OptiMizer™ Pre-dry Setup screen shows all of the time values for the Pre-dry
mode of OptiMizer™ operation. All of the Pre-dry operator messages are activat-
ed based on these time values. The ‘Automatic Cool down’ Enable/Disable push-
buttons are also on this screen. Automatic Cool Down refers to how the system
reacts when the system reaches the ‘Material Should be Cooled Time’ limit during
Predry, or if the system is in the Shutdown mode. If the automatic Cool Down is
enabled, the system will go through either the timed or temperature Cool Down
without operator intervention when the “Material Should be Cooled Time” is
reached.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...