4
O
p
er
at
io
n
O p e r a t i o n l
4-45
Control Function Descriptions
(continued)
Screen 30 -Instrument Setup 3 Screen
To access the Instrument Setup 3 Screen (Screen 30):
1
Press the "Instrument 3” button
located on the Equipment Setup Screen
(Screen 20).
The Instrument Setup 3 screen provides the user with a summary of the EnergySmart
Dryer instrument setpoints and data for:
• Drying Monitor Temperature (T6)
• Drying Monitor Temperature (T5)
• Drying Monitor Temperature (T4)
• Drying Monitor Temperature (T3)
• Drying Monitor Temperature (T2)
• Drying Monitor Temperature (T1)
• Hopper Outlet Return Air Temperature
Where applicable, the settings and data contained on this screen include:
• Offset
• Scaled Output
• Units
If the user is logged-in at the proper security level, all setpoints contained on this
screen can be changed using the pop-up keypad window.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper security
level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used to
change the setpoint.
See Operation
section entitled, Example Set Point
Change.
After the new setpoint
value has been entered, press the
"Enter"
key to lock in the new set-
point.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...