14.1 Fundamental settings
14-5
14.1 Fundamental settings
At first, fundamental settings to operate each axis are shown as follows.
14.1.1 Control cycle
The following 2 settings specify the control cycle of YS 840DI system.
• DP cycle: Interpolation cycle of CNC and data transmission cycle between CNC and a
drive.
• IPO cycle: Program block analysis cycle of CNC.
IPO cycle must be an integral multiple (
×
1,
×
2, ...) of a DP cycle.
DP cycle setting
Currently, you can select 2 ms or 4 ms as a DP cycle.
In YS 840DI system, the following standard values are set.
• Machining center
: 0.002 sec (2 ms)
• Turning
: 0.004 sec (4 ms)
The DP cycle is set through a hardware configuration using a PLC set-up tool "STEP7".
Refer to STEP7 instruction for more information.
You can check the DP cycle, having been set by the hardware configuration, by using the
following machine data (read-only data).
• MD10050 SYSCLOCK_CYCLE_TIME
Meaning: DP cycle time
Displayed value: [sec]
IPO cycle setting
IPO cycle is to be set to an integral multiple of the DP cycle.
You can set IPO cycle using the following machine data.
• MD10070 IPO_SYSCLOCK_TIME_RAITIO ##
Meaning: IPO cycle time
Setting value: Integral multiple of DP cycle
Standard setting value: 2 to 4
• MD19296 ON_PERFORMANCE_INDEX ##
Meaning: Limitation to IPO cycle
Standard setting value: 4
Summary of Contents for CNC Series
Page 1: ...Maintenance Manual Serviceman Handbook MANUAL No NCSIE SP02 19 Yaskawa Siemens CNC Series...
Page 26: ...Part 1 Hardware...
Page 38: ...System Configuration 1 2 3 Spindle motor designations 1 12...
Page 58: ...Installing the control panels 2 3 5 Installing lightning surge absorbers 2 20...
Page 62: ...Installing the motors 3 4...
Page 84: ...Connection method 4 3 2 Setting the rotary switches on the inverters and servo units 4 22...
Page 96: ...Part 2 Software...
Page 102: ...Software configuration 6 6...
Page 113: ...7 2 Network settings 7 11 8 Click on the radio button to the left of Specify an IP address...
Page 121: ...7 2 Network settings 7 19...
Page 122: ...Part 3 PLC...
Page 154: ...Part 4 Setting up and maintenance...
Page 160: ...Overview of System 10 1 2 Basic operation 10 6...
Page 204: ...How to use Digital Operation 12 2 9 Setting the password setting for write prohibit 12 32...
Page 327: ...Error and Troubleshooting 15 4...
Page 328: ...15 1 Errors without Alarm Display and Troubleshooting 15 5...
Page 329: ...Error and Troubleshooting 15 6...
Page 343: ...Maintenance and Check 16 3 3 Setting up Initializing Absolute encoder 16 14...