APPENDIX B1
Maintanace / Check and Inspections
CAUTION:
Before any maintenance intervention, not needing the machine running, disconnect the supply
voltage and put the signal MAINTENANCE IN PROGRESS next to the Main switch
Carrying out the tests and check program listed below will extend the life of the equipment and avoid possible breakdowns.
Please Note: it is of utmost importance the compliance with
Regulation (EC) No 842/2006
, regarding mandatory regular
leakage-check program, as described in Section 2 of this Operation and Maintenance Manual.
Check mechanical working of the compressor . Control the absence of metallic vibrations and not too high noises and
temperatures on the compressor head during running to verify its regular working.
Check the operation of the fan.
Check the electrical alarm systems and controls.
Check the filling of the tank (visual level). If the system is filled with a glycol-mix, refill only with the same mix. Only water will
reduce the concentration of glycol.
Check that pressure, flow rate and temperature values of the hydraulic circuit are included into the limits indicated on the
machine label. For closed loop system (PWW) pelase verify periodically the pressure indicated on the manometer (with
pump OFF) to verify the precharge value. If it’s necessary a refill please follow the start up procedure in Appendix A2.
Picture 22
– Compressor placement
Picture 23
– Fan placement
Summary of Contents for EB 130 WT
Page 20: ...English 20 APPENDIX A1...
Page 21: ...English 21 APPENDIX A2...
Page 26: ...English 26 Max pressure valve Thermostatic Valve Evaporator Refrigerant pipes Fan Pump...
Page 54: ...Deutsch 54 ANLAGE A1...
Page 56: ...Deutsch 56 ANLAGE A2...
Page 62: ...Deutsch 62 H chstdruckventil Thermostatisches Ventil Verdampfer K hlmittelrohre L fter Pumpe...
Page 89: ...Italiano 89 ALLEGATO A1...
Page 91: ...Italiano 91 ALLEGATO A2...
Page 124: ...Espa ol 124 ANEXO A1...
Page 126: ...Espa ol 126 ANEXO A2...
Page 159: ...Fran ais 159 ANNEXE A1...
Page 161: ...Fran ais 161 ANNEXE A2...
Page 177: ...177 1 2 3 4 5 6 7 8 8 1 9 10 11 12 A1 A2 B1 B2 C 1 2 D 1 12 2 EN 60204...
Page 178: ...178 30 435 PSI 5 8 85 PSI PWW PS 12...
Page 182: ...182 4 7 3...
Page 183: ...183 3 b PWW 3 4 PWW 9000 12000 1 PWW 18000 24000 3 4 PWW 9000 12000 1 PWW 18000 24000 4...
Page 187: ...187 60 90 m PFANNENBERG 18 15 ISO 4406 10 40 C 45 C 50 C 15 C PFANNENBERG 0 C 11 A1 A2 PWW A2...
Page 189: ...189 11 12 13 14...
Page 190: ...190 l R S T 15 16 17...
Page 191: ...191 5 R S T 18 19 20 21...
Page 192: ...192 PFANNENBERG...
Page 193: ...193 12 KLIXON 2 1 Klixon...
Page 194: ...194 40 C...
Page 195: ...195...
Page 196: ...196 A1...
Page 198: ...198 A2...
Page 200: ...200 B1 n 842 2006 2 PWW 22 23...
Page 201: ...201 A2 20 30 5 7 11 24 25...
Page 202: ...202 24 36 25 309 1 2004...
Page 203: ...203 B2 EB EB150 T EB190 WT...
Page 204: ...204...
Page 205: ...205 C 1 Pfannenberg PFANNENBERG 1 2 3 26 2 1 0...
Page 210: ...210 2 PWW INLET 2 1 31 PWW Air purge valve Max safety valve Refill valve...
Page 211: ...211 D 1 1 1 90 m pH 1 2 3 4 32...