Model 4200A-SCS Parameter Analyzer Reference Manual
Appendix F: Set up a probe station
4200A-901-01 Rev. C / February 2017
F-17
Test flow
When you run the
probesubsites
project, the following occurs:
1. The action
prober-init
initializes the prober driver.
2. The test moves to
subsite1
,
4terminal-n-fet
.
3. The action
prober-contact
moves the chuck to the wafer.
4. The action
connect
connects the SMUs to the probes for the n-channel MOSFET as shown in
the following figure.
Figure 631: Connect SMUs to N-channel MOSFET
5. The test runs vds-id-1x, which generates a family of curves (I
D
vs. V
D
) for the MOSFET.
6. The test moves to
3terminal-npn-bjt
.