Model 4200A-SCS Parameter Analyzer Reference Manual
Section 8: Keithley User Library Tool (KULT)
4200A-901-01 Rev. C / February 2017
8-65
Dialog box test examples
The following examples demonstrate how you can use dialog boxes in a test sequence.
Example: Announce end of test
For this example, you will create a user test module (UTM) that uses the OK dialog user module. This
dialog box announces the end of a test sequence. You can use this UTM in any project at the end of
any test sequence.
To create an end-of-test announcement:
1. In the Clarius project tree, select the last test. The announcement will occur after this test.
2. Choose
Select
.
3. Select the
Tests
tab.
4. For the Custom Test, select
Choose a test from the pre-programmed library (UTM)
.
5. Drag
Custom Test
to the project tree. The test has a red triangle next to it to indicate that it is not
configured.
6. Select
Rename
.
7. Enter the name
End of test prompt
.
8. Select
Configure
.
9. In the Test Setting pane on the right, set the User Libraries to
Winulib
.
10. Set User Modules to
OkDialog
.
11. For NumberOfMessages, enter
2
.
12. For Message1Text, enter
Test Finished
.
13. For Message2Text, enter
Click OK to continue
. An example is shown in the graphic below.
Figure 458: New UTM using OkDialog user module