Model 4200A-SCS Parameter Analyzer Reference Manual
Section 6: Clarius
4200A-901-01 Rev. C / February 2017
6-219
Identify plot coordinates with crosshairs
You can display crosshairs that can be positioned anywhere on the graph. An example is shown in
the following figure. The x and y values are displayed when the crosshairs are on a data point.
Figure 375: Graph with crosshairs
To display crosshairs, right-click the graph and select
Crosshair
. Select
Crosshair
again to remove
them.
Synchronize graphs for one test executed at multiple sites
Ideally, data from a single test that is gathered at multiple, identically fabricated sites should be
plotted on multiple, identically configured graphs. For a single test in the project, you can use the
Synchronize Graphs function to
automatically configure the graphs identically for all sites, using one
of the graphs as a master.
For example, if you executed the vds-id#1 test at the first five sites of a project, Synchronize Graphs
identically configures graphs for the Site 1, 2 , 3, 4, and 5 Run worksheets.
If the project contains multiple instances of a same-named test, you must apply the feature
separately each such instance. For example, if the project tree shows both vds-id#1 and vds-id#2
tests, you must apply Synchronize Graphs separately for vds-id#1 and vds-id#2.
The graphs for the selected test will be configured identically for all project sites, both for the present
data and for all future data. This applies to future graphs for all sites, even if data was not yet
generated for some sites at the time Synchronize Graphs was requested. The only way to undo
these effects is to manually reconfigure each site-specific graph.
To synchronize multi-site graphs:
1. From the project tree, select the site for which you want to configure a master graph.
2. In the project tree, select the test for which the data is to be graphed.
3. Select
Analyze
for the test.
4. On the graph, select
Graph Settings
.
5. Select
Synchronize Graphs.
A caution message appears.
6. If you are sure that you wish to proceed, click
Yes
. The graphs for the selected test are now
configured identically for all project sites.