IDA8 Global-Net User Manual
394
© 2017, ATEÏS, member of PAX ProAV Group
Bit 152 MATLAB_L45_CORRUPTION
Bit 153 MATLAB_M25_CORRUPTION
Bit 154 MATLAB_M35_CORRUPTION
Bit 155 MATLAB_M45_CORRUPTION
Bit 156 MATLAB_XL25_CORRUPTION
Bit 157 MATLAB_XL35_CORRUPTION
Bit 158 MATLAB_XL45_CORRUPTION
4.5.2
Modbus Control
4.5.2.1
Table of Modbus
4.5.2.1.1 Status
AddressLength Name
Type
Bit
Value Function
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Hex
Global Status
0
1
Global
Status
R
1
#8000
General deferred defaults
synthesis
1
#4000
General immediate defaults
synthesis
1
#2000 Primary device is active
1
#1000 Secondary device is active
1
#0800 Backup device is in fault
state
1
#0400 Ethernet network
disconnected
1
#0200 General evacuation state
synthesis
1
#0100 NTP server unavailable
1
#0080 System fault (internal)
1
#0040 Local Ateis-Net in backup
mode (only one segment
open)
1
#0020 Local Ateis-Net broken
(more than one segment
open)
1
#0010 Global Ateis-Net in backup
mode (only one segment
open)
1
#0008 Global Ateis-Net broken
(more than one segment
open)
1
#0004 System in bypass mode
1
1
Free
2
1
Free
3
1
W atchd
og
Output
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Number increased
automatically by IDA8, every
8 seconds
4
1
W atchd
og Input
R/W
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Number increased
automatically by the
Modbus client, every 8
seconds
5
1
Max
Record
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Maximum duration for
message recording, in
seconds.
6
1
Global
Change
Counter
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Counter increased at every
change (occupancy state,
and default state)
7
1
Busy
Change
Counter
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Counter increased at every
change of the occupancy
state.
8
1
Fault
Change
Counter
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Counter increased at every
change of the occupancy
state.
9
1
Executio
n
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
"1", when the command
(Routing Action) is
currently in treatment.
10
1
Message
Change
Counter
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Counter increased at every
change of the internal
message list
11
1
Schedul
er
Change
Counter
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Counter increased at every
change of the internal
scheduler list
12
1
Remote
IO
Change
Counter
R
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Counter increased at every
change of either evac input
or contact output
13
1
Free