2 - 28
SPEC
CABLE ROUTING DIAGRAM
1
Throttle cable
2
Clamp
3
Brake hose
4
Hot starter cable
5
Clutch cable
6
Hose guide
7
Clutch switch lead
8
“ENGINE STOP” button
lead
9
Trip meter cable
0
Main switch lead
A
Trip meter
B
Main switch
C
Start switch lead
Å
Fasten the start switch lead to the
handlebar with the plastic bands.
ı
Fasten the “ENGINE STOP” but-
ton lead and clutch switch lead to
the handlebar with the plastic
bands.
Ç
Pass the brake hose through the
hose guides.
Î
Pass the start switch lead in front
of the main switch lead.
‰
Pass the hot starter cable
between the handle crown and
coupler bracket.
Ï
Pass the throttle cables and clutch
cable between the handle crown
and trip meter.
Содержание WR450F(S)
Страница 288: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger ...
Страница 289: ...3 55 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger ...
Страница 752: ......
Страница 753: ......