2 - 25
SPEC
CABLE ROUTING DIAGRAM
1
Hot starter cable
2
Clutch cable
3
Throttle cable (return)
4
Throttle cable (pull)
5
Ignition coil
6
Negative battery lead
7
Starter motor lead
8
Coolant reservoir tank
breather hose
9
Rectifier/regulator
0
Cable holder
A
Coolant reservoir hose
B
Rectifier/regulator lead
C
Clamp
D
CDI unit lead
E
CDI unit
F
CDI unit band
G
CDI unit stay (frame)
H
Cable bracket
Å
Pass the throttle cables, clutch
cable and hot starter cable through
the cable guides.
ı
Pass the throttle cables, clutch
cable and hot starter cable between
the radiator and frame, then over
the middle radiator mounting boss.
Ç
Pass the throttle cables and clutch
cable on the outside of the ignition
coil.
Î
Pass the carburetor breather hose
(throttle cable cover) through the
hose holder.
‰
Fasten the coolant reservoir tank
breather hose and carburetor
breather hoses together with a
plastic locking tie.
Ï
Fasten the grommet of the clutch
cable with the cable holder.
Ì
Fasten the rectifier/regulator lead to
the frame with a plastic locking tie
and cut off the tie end.
Ó
Fasten the CDI unit lead to the
frame with a plastic locking tie ends
at the lower of the frame and cut off
the tie end.
È
Insert the CDI unit band over the
CDI unit stay (frame) as far as pos-
sible.
Ô
Fasten the starter motor lead and
negative battery lead to the cable
bracket in its slot with a plastic lock-
ing tie and cut off the tie end.
Do not allow the rectifier/regulator
lead to slacken.
Содержание WR450F(S)
Страница 288: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger ...
Страница 289: ...3 55 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger ...
Страница 752: ......
Страница 753: ......