Installing the Inverter
36
Items
Check Point
Ref.
Result
use)?
Are power factor correction capacitors,
surge protection and electromagnetic
interference filters installed correctly?
(These devices MUST not be installed
on the output side of the inverter.)
p.22
Control Terminal Wiring
Are STP (shielded twisted pair)
cables used for control terminal
wiring?
-
Is the shielding of the STP wiring
properly grounded?
-
If 3-wire operation is required, are the
multi-function input terminals
defined prior to the installation of the
control wiring connections?
p.26
Are the control cables properly
wired?
p26
Are the control terminal screws
tightened to their specified torques?
p.17
Is the total cable length of all control
wiring < 165ft (100m)?
p.24
Is the total length of safety wiring <
100ft (30m)?
p.24
Miscellaneous
Are optional cards connected
correctly?
-
Is there any debris left inside the
inverter?
p.17
Are any cables contacting adjacent
terminals, creating a potential short
circuit risk?
-
Are the control terminal connections
separated from the power terminal
connections?
-
Have the capacitors been replaced if
they have been in use for > 2 years?
-
Have the fans been replaced if they
have been in use for > 3 years?
-
Has a fuse been installed for the
power source?
p.363
Are the connections to the motor
separated from other connections?
-
Содержание Rsi S Series
Страница 2: ......
Страница 6: ......
Страница 12: ...Preparing the Installation 0...
Страница 22: ...Preparing the Installation 10...
Страница 70: ...LearningAdvanced Features 58...
Страница 152: ...LearningAdvanced Features 140 PID controlblock diagram...
Страница 224: ...LearningAdvanced Features 212...
Страница 356: ...344...
Страница 362: ...Maintenance 350...
Страница 381: ...369 TechnicalSpecification...
Страница 397: ......