![background image](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745436.webp)
3
Mount collar
59
and put snap ring
60
in position. Take
care to mount the collar in the correct direction, as
noted in
Dismantling
.
94 - 5
1
Position collar
54
on pinion shaft
53
and mount the
plate
56
. Take care to mount in the correct direction.
2
Heat the bearing
57
to 50 °C above ambient
temperature and press fit it on the pinion shaft.
Note:
Do not heat to a temperature greater than 100 °C.
Section E
Hydraulics
9803/6410
Section E
94 - 5
Issue 1
Slew Motor
Reduction Gear
Assembly
Refer to the sectional drawing on page E/83-2 as a guide to
dismantling and assembling.
Apply clean hydraulic fluid to all sliding contact faces during
assembly.
4
Grease the rollers of bearing
57
.
Note:
Although the total grease capacity is 1000 cc, only 400
cc is used in the above procedure; the rest should be added
after assembly.
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...