![background image](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745401.webp)
82 - 2
Section E
Hydraulics
9803/6410
Section E
82 - 2
Issue 1
Rotary Coupling
Removal (cont’d)
4
Remove lock bar mounting screws
X
, washer
Y
and
lock bar
Z
.
Remove rotary coupling installation bolts
1
and
washers
2
.
Replacement
1
Align the assembly
9
to the lower frame and tighten
rotating joint installation bolts
1
and washers
2
.
Install lock bar
Z
and tighten mounting screws
X
and
washers
Y
to specified torque of 109-127 Nm (80.28-
93.28 lbf ft, 11.1-12.9 kgf m).
2
Reconnect the hoses and install the access cover.
Remove the wooden block, then lower the machine to
the ground.
Start the machine and check for leaks.
JS00180
JS00180
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...