![jcb JS130 Service Manual Download Page 172](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745172.webp)
7 - 1
Section C
Electrics
9803/6410
Section C
7 - 1
Issue 1
Revolution Sensor
Revolution Sensor Removal and
Installation
1
Prepare the Machine
Position the machine on level ground.
Stop the engine and remove the starter key.
2
Locate the Flywheel housing
a
The flywheel housing is machined to accommodate
the sensor.
b
Remove the sensor by unscrewing it.
Note:
Check the 'O'-ring for damage or wear, replace if
necessary.
3
Installation is by screwing the sensor in the machined
section at a torque of 44.13-53.0 Nm(33-40 lb ft).
Note:
The clearance between the sensor and the flywheel is
3.1 +0.4 mm.
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...