![background image](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745033.webp)
2 - 2
Initial Precautions for New Machine Usage
!
!
CAUTION
If the machine is operated at full load, before its initial
run-in procedure is complete it may cause scuffing and
seizing which can adversely effect the life of the
machine.
8-3-1-5
A new machine is only dispatched when it has completed all
its inspection procedures, but operating it under severe
conditions from new will affect its performance and shorten
its service life.
1
Carry out the Daily inspection procedure
2
Always warm up the machine sufficiently
3
Hold the engine speed to 80% of the maximum
4
Check to see if the machine is running normally
5
Avoid running or swinging the machine rapidly
6
Avoid sudden shocks e.g. suddenly stopping the boom
when lowering
7
Where applicable, grease the front pins daily
8
At 50 hrs carry out servicing
Section 3
Routine Maintenance
9803/6410
Section 3
2 - 2
Issue 1
Service Schedules
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...