![background image](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745144.webp)
5 - 5
Section C
Electrics
9803/6410
Section C
5 - 5
Issue 1
Pump Control
Cushioned Boom Starting
Circuit Diagram
Time Chart
When the boom lowering pressure switch turns ON, the solenoid valve switches on for 0.4 sec, and pilot pressure is sent to
the negative control signal port of the pump. This pilot pressure adjusts the pump swashplate angle to temporarily reduce the
output flow and thereby initially slow down (cushion start) the boom lowering facility.
If travel and boom lowering procedure are initiated together, the boom cushioned start facility is not available, the travel pilot
pressure being monitored and inhibiting the facility.
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...