![background image](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745377.webp)
76 - 3
Section E
Hydraulics
9803/6410
Section E
76 - 3
Issue 1
Hydraulic Rams
Reconditioning (cont’d)
Set the bedding jig underneath the press.
Apply a thin coat of lubricant to the tapered section of the
bedding jig and place the jig with the tapered section
facing up.
Be careful that no dust, chipped metal and lint adheres to
the jig.
Slowly and evenly insert the piston, with the seal ring fitted,
into the bedding jig.
Carefully press the piston into the bedding jig until the
seal is in full contact with the bedding surface.
7
Bedding jig preparation
8
Inserting the piston
9
Press fit
JS02130
JS02140
JS02150
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...