9 - 7
Section F
Transmission
9803/6410
Section F
9 - 7
Issue 1
Reduction Gear - JS130
Assembly (cont’d)
When Assembling (cont’d)
6
When installing spur gears 7 on flange 3 position
alignment marks X as shown.
7
If bearing 149 has been removed from shaft 102 it will
be necessary to fit a new bearing. Heat the bearing to
100 ± 10 °C (212 ± 18 °F) before fitting. Smear the outer
face of the outer race with molybdenum disulphide
grease.
8
Tighten the plug and bolts to the torques indicated
below:
JS00470
Torques
Part
Nm
lbf ft
kgf m
Reamer bolt 19
540 ± 69
398 ± 51
55 ± 7
Plug 33
58 ± 26
43 ± 14
6 ± 2
Bolt 35
102 ± 16
75 ± 12
10.4 ± 1.6
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...