![background image](http://html1.mh-extra.com/html/jcb/js130/js130_service-manual_3610745405.webp)
82 - 6
Assembly (cont’d)
3
After installing the 'O'-ring and packing rings, check
with a mirror to see if they are installed correctly.
After checking, coat with grease then check once more
for any protrusion, twisting, etc.
4
Install V-ring
12
on axle
11
and coat with grease.
Take care to prevent contamination of the grease by
water or dirt.
5
Install axle
11
to the rotor
13
.
Note:
Set V-ring
12
so that it will not be cut or scratched.
6
Install thrust plate
16
onto the axle
11
using cap screws
17
.
Torque Settings
17
31.46 - 37.29 Nm (23.2 - 27.5 lbf ft)
Section E
Hydraulics
9803/6410
Section E
82 - 6
Issue 1
Rotary Coupling
17
16
11
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...