82 - 5
Assembly
Inspect the parts for signs of wear, pitting, scratching,
discolouration etc. Polish out scratches using a fine grade
oil stone.
Before assembly, thoroughly clean all parts using a suitable
solvent: Do NOT use solvents on 'O'-rings, back-up rings
and seals.
Fit new 'O'-rings, back-up rings and seals.
Lubricate all 'O'-rings, back-up rings and seals, with clean
hydraulic fluid before fitting.
1
a
Clean the rotor
13
with cleaning fluid or compressed
air.
b
After cleaning, check to see if there are any
scratches or roughness on the inner side of the
rotor or grooves.
2
Coat packing rings
15
and ‘O’-ring
14
with hydraulic oil
and install in the order given below:
a
Set one packing ring
15
in each groove starting
from the 2nd groove from the top.
b
Set 'O'-ring
14
in the top groove.
Section E
Hydraulics
9803/6410
Section E
82 - 5
Issue 1
Rotary Coupling
JS00220
JS01800
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...