3 - 2
Section 3
Routine Maintenance
9803/6410
Section 3
3 - 2
Issue 1
Greasing (continued)
Excavator End
16 Grease Points
!
!
WARNING
You will be working close into the machine for these
jobs. Lower the attachments if possible. Remove the
starter key and disconnect the battery. This will prevent
the engine being started.
8-3-1-3
(No.)
Greasing Points
Reference
Number of greasing points
drawing
Boom
3.
Boom ram, eye end pin
1
2.
Centralised greasing (total of 6 points)
Dipper ram, dump end pin
1.
Boom ram, dump end pin
2
2.
Bucket ram to Bucket linkage pin
2.
Bucket linkage to Bucket pin
3
1.
(total of 5 points)
Dipper to Bucket Linkage pin
1.
Dipper to Bucket pin
1.
Bucket ram, dump end pin
1.
Dipper ram, eye end pin
4
1.
(total of 3 points)
Boom to Dipper, connecting pin
1.
}
Summary of Contents for JS130
Page 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Page 118: ......
Page 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Page 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Page 207: ......
Page 209: ......
Page 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Page 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...