GE H
EALTHCARE
D
IRECTION
5158821-100, R
EVISION
3
E
X
PLORE
L
OCUS
SP S
ERVICE
G
UIDE
Page 241
8.2.23
Perform Periodic Abridged Calibration
PERFORM ABRIDGED CALIBRATION
•
Verify Stage Alignment (see topic 7.4.4)
•
Perform Abridged Calibration (see topics 7.5.1 Centre the Stage, Perform Verification Scans
7.5.2, Edit Calibration Settings 7.5.3, Follow Up 7.5.4).
Section 8.3
Preventive Maintenance Checklist
8.3.1
Completing and Filing the Checklist
1.
Copy the
Preventive Maintenance Performance Checklist
on the following 2 pages.
2.
Check off each task completed.
3.
Sign and date the form.
4.
Provide a copy of the form to the client.
5.
Make a photocopy and send to Service Engineering:
Service Engineering
Attn:
Janice Chu
1510 Woodcock Street, Unit #7
London, ON N6H 5S1
Canada
Содержание Healthcare eXplore Locus SP
Страница 2: ...This page is intentionally left blank...
Страница 12: ...GE HEALTHCARE DIRECTION 5158821 100 REVISION 3 EXPLORE LOCUS SP SERVICE GUIDE Page 12...
Страница 13: ...GE HEALTHCARE DIRECTION 5158821 100 REVISION 3 EXPLORE LOCUS SP SERVICE GUIDE Page13...
Страница 37: ...GE HEALTHCARE DIRECTION 5158821 100 REVISION 3 EXPLORE LOCUS SP SERVICE GUIDE Page37...
Страница 228: ...GE HEALTHCARE DIRECTION 5158821 100 REVISION 3 EXPLORE LOCUS SP SERVICE GUIDE Page 228...