Description
Value
Cause Code
PPP LCP negotiation timed out.
Codes 40 through 49 apply to PPP
sessions.
Note
Timeout-PPP-LCP
40
PPP LCP negotiation failed.
Failed-PPP-LCP-Negotiation
41
PPP PAP authentication failed.
Failed-PPP-PAP-Auth-Fail
42
PPP CHAP authentication failed.
Failed-PPP-CHAP-Auth
43
PPP remote authentication failed.
Failed-PPP-Remote-Auth
44
PPP received a Terminate Request from
remote end.
PPP-Remote-Terminate
45
Upper layer requested that the session be
closed.
PPP-Closed-Event
46
PPP session closed because there were no
NCPs open.
NCP-Closed-PPP
47
PPP session closed because of an MP error.
MP-Error-PPP
48
PPP session closed because maximum
channels were reached.
PPP-Maximum-Channels
49
Disconnect due to full terminal server
tables.
Tables-Full
50
Disconnect due to full internal resources.
Resources-Full
51
IP address is not valid for Telnet host.
Invalid-IP-Address
52
Hostname cannot be validated.
Bad-Hostname
53
Port number is invalid or missing.
Bad-Port
54
TCP connection has been reset.
Codes 60 through 67 apply to
Telnet or raw TCP sessions.
Note
Reset-TCP
60
TCP connection has been refused by the
host.
TCP-Connection-Refused
61
TCP connection has timed out.
Timeout-TCP
62
TCP connection has been closed.
Foreign-Host-Close-TCP
63
TCP network is unreachable.
TCP-Network-Unreachable
64
Consolidated Platform Configuration Guide, Cisco IOS Release 15.2(4)E (Catalyst 2960-X Switches)
920
Information about RADIUS
Summary of Contents for Catalyst 2960 Series
Page 96: ......
Page 196: ......
Page 250: ......
Page 292: ......
Page 488: ......
Page 589: ...P A R T VI Cisco Flexible NetFlow Configuring NetFlow Lite page 509 ...
Page 590: ......
Page 619: ...P A R T VII QoS Configuring QoS page 539 Configuring Auto QoS page 645 ...
Page 620: ......
Page 750: ......
Page 1604: ......
Page 1740: ......
Page 2105: ...P A R T XII Configuring Cisco IOS IP SLAs Configuring Cisco IP SLAs page 2025 ...
Page 2106: ......
Page 2118: ......
Page 2164: ......