2-15
CABLE ROUTING DIAGRAM
SPEC
1
Ignition coil lead
2
Clamp
3
CDI magneto lead
4
Neutral switch lead (except for
USA and CDN)
5
Radiator breather hose
6
Connector cover
A
Clamp the ignition coil lead to
the frame at its locating tape.
Clamp it in front of the radiator
fitting boss.
B
Clamp the CDI magneto lead to
the frame at its locating tape.
Clamp it at the rear of the radia-
tor fitting boss.
C
Do not allow the neutral switch
lead to slacken except over the
radiator hose. (except for USA
and CDN)
D
Pass the neutral switch lead
through the holder. (except for
USA and CDN)
E
Pass the radiator breather hose
outside the engine bracket and
inside the down tube. Then
pass the radiator breather hose
inside the CDI magneto lead.
F
Clamp the CDI magneto lead,
radiator breather hose, YPVS
breather hose and neutral
switch lead (except for USA and
CDN) to the frame.
G
Clamp the radiator breather
hose, CDI magneto lead and
neutral switch lead (except for
USA and CDN) to the frame.
H
Pass the CDI magneto lead,
radiator breather hose and neu-
tral switch lead (except for USA
and CDN) in front of the radiator
hose. Then pass the radiator
breather hose inside the CDI
magneto lead and neutral
switch lead (except for USA and
CDN).
I
Pass the radiator breather hose
and ignition coil lead between
the frame and the radiator (left).
J
Locate the clamp ends in the
arrowed range.
K
Bring the connector cover into
contact with the coupler.
1P8-9-32-2 4/29/06 11:46 AM Page 56
Summary of Contents for YZ250(W)/W1
Page 78: ...2 11 MAINTENANCE SPECIFICATIONS SPEC MEMO...
Page 594: ...TUN MEMO...