15
Data Strobe Timing (DST) Tests
228
DDR2(+LP) Compliance Testing Methods of Implementation
tDSS, DQS Falling Edge to CK Setup Time - Test Method of Implementation
The purpose of this test is to verify that the time interval from the falling edge of the data strobe (DQS
falling edge) output access time to the clock setup time, is within the conformance limit as specified
in the JEDEC specification.
Signals of Interest
Mode Supported: DDR2, LPDDR2
Signal cycle of interest: WRITE
Signal(s) of Interest:
• Data Strobe Signal (supported by Data Signal)
• Clock Signal
Optional signal(s):
• Chip Select Signal (this signal is used to separate DQ signals from different rank of memory)
Signals required to perform the test on the oscilloscope:
• Data Signal, DQ
• Data Strobe Signal, DQS
• Clock Signal, CK
• Chip Select Signal, CS (optional)
Test Definition Notes from the Specification
Table 146
Timing Parameters by Speed Grade (DDR2-400 and DDR2-533) & (DDR2-667 and DDR2-800)
Parameter
Symbol
DDR2-400
DDR2-533
Units
Specific
Notes
Min
Max
Min
Max
DQS falling edge to CK setup time
tDSS
0.2
x
0.2
x
tCK(avg)
Parameter
Symbol
DDR2-667
DDR2-800
Units
Specific
Notes
Min
Max
Min
Max
DQS falling edge to CK setup time
tDSS
0.2
x
0.2
x
tCK(avg)
30
Table 147
Timing Parameters by Speed Grade (DDR2-1066)
Parameter
Symbol
DDR2-1066
Units
Specific
Notes
Min
Max
DQS falling edge to CK setup time
tDSS
0.2
x
tCK(avg)
25
Table 148
LPDDR2 AC Timing Table
Parameter
Symbol
Min
Max
Min
t
CK
LPDDR2
Unit
1066
933
800
677
533
466*
5
400
333
266*
5
200*
5
Write Parameters*
14
DQS falling edge
to CK setup time
tDSS
Min
0.2
tCK(avg)
Summary of Contents for D9020DDRC
Page 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Page 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Page 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Page 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Page 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Page 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...