15
Data Strobe Timing (DST) Tests
210
DDR2(+LP) Compliance Testing Methods of Implementation
Probing for Data Strobe Timing Tests
When performing the Data Strobe Timing tests, the DDR2(+LP) Compliance Test Application will
prompt you to make the proper connections. The connection for Data Strobe Timing tests may look
similar to the following diagram. Refer to the Connection tab in DDR2(+LP) Electrical Performance
Compliance Test application for the exact number of probe connections. Typically, you need
minimum three probe connections to run the tests.
You can use any of the oscilloscope channels as Pin Under Test (PUT) source channel. You can
identify the channels used for each signal in the Configuration tab of the DDR2(+LP) Compliance
Test Application. (The channels shown in
are just examples).
For more information on the probe amplifiers and differential probe heads, see
Probing,” starting on page 351.
Test Procedure
1 Start the automated test application as described in
“Starting the DDR2(+LP) Compliance
2 Ensure that the RAM reliability test software is running on the computer system where the
DDR2/LPDDR2 Device Under Test (DUT) is attached. This software will perform test on all the
unused RAM on the system by producing repetitive burst of read-write data signals to the
DDR2/LPDDR2 memory.
3 Connect the differential solder-in probe head to the PUTs on the DDR2 devices.
4 Connect the oscilloscope probes to any channels of the oscilloscope.
5 In the DDR2(+LP) Test application, click the Set Up tab.
Figure 30
Probing for Data Strobe Timing Tests with Three Probes
Infiniium Oscilloscope
Infiniium Oscilloscope
DDR2 DIMM
InfiniiMax solder-in probes
Summary of Contents for D9020DDRC
Page 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Page 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Page 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Page 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Page 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Page 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...