Copyright 2022 Baker Hughes Company.
36 | DPI 610E Instruction Manual–English
Chapter 2. Pump Operations
Step 3
Make sure that the pressure release knob is at its fully closed position
(hand tight): turn the knob in a clockwise direction.
Step 4
The reservoir must be connected the reservoir port and filled to the
required level. See Section 2.2.1 on page 34.
Step 5
Power ON the instrument by holding down the power button for
2 seconds until the Druck splash screen appears.
Step 6
Select the required pressure function from the Channel Function
screen.
Note:
From the Dashboard select:
CALIBRATOR >>
or
>> FUNCTION >> Pressure>
INT>>Normal
Press the
Tick
softkey and press the
Back
icon to show
the previous screen.
Step 7
Select the required units.
Note:
From the Dashboard select:
CALIBRATOR >>
or
>> UNITS >> either tap the unit
required on the screen or use the Navigation key pad arrow
keys to select the unit.
Press the
Tick
softkey and press the
Back
button to
show the previous screen.
Step 8
Slowly operate the priming pump until the pressure reaches 5-10 bar.