Copyright 2022 Baker Hughes Company.
English–DPI610E Instruction Manual | 133
Leak Test
Step 5
Select the
PLAY
softkey to begin
the task. (This icon will change to a
STOP
icon after selection).
Note
: the displayed
WAIT TIME
and
TEST TIME
settings will be cleared.
Note
: If a
WAIT TIME
has been set, a
“Waiting” countdown begins from the
WAIT TIME
value down to zero. This
potentially gives enough time for the
pressure to stabilize.
After the
WAIT
time has elapsed, the
test begins. The Start pressure value is
recorded on the screen at the start of
the test. A “Testing” countdown begins
from the
TEST TIME
value down to
zero.
When the
TEST TIME
has elapsed, the
End
pressure value is also recorded
and the
Leak Rate
per minute is
calculated and displayed as the Leak
test result.