7. Install the AutoTest board and start the
vacuum RF test.
8. During pump down, the pressure display on the TM 20 drops below
10 mTorr within 15 minutes.
9. During the test, the pressure displayed on the LCD should remain
stable. This is the value of the Baratron. The zero pot should be
adjusted to equal the value measured by the TM-20 vacuum gauge.
10. After completion of the test remove the gauge, re-assemble the
vacuum pump.
11. Perform a complete leak back test. If the test fails, inspect the
system for leaks.
Figure 13-2. Baratron Test Equipment
Product Certification
Certification Procedures
13-8
STERRAD® 100 Sterilizer
ASP Service Guide rev. D
Summary of Contents for STERRAD 100
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......