13. Verify that the vacuum pump is filled with oil to the white indicator
line.
14. Switch the gas ballast valve to OPEN.
15. Connect the throttle valve harness, vent valve, oil return solenoid and
vacuum switch electrical connections. The illustration shown
previously details the assembled vacuum system.
Power Connection
1. Verify that the main circuit breaker located on the AC interface
assembly is in the OFF position.
2. Plug the vacuum pump AC power connector into the designated
receptacle on the AC enclosure.
3. Check all circuit breakers located on the AC enclosure. The circuit
breakers are on the side of the unit and accessible with the panels in
place. Verify that all circuit breakers are ON. Movement during
shipping may cause the circuit breakers to trip.
4. Check that all of the connectors throughout the entire machine are in
place and correctly mated. Some of the connectors may have worked
loose in shipment.
5. Remove both control enclosure panels and ensure that all cables
attached to the connector distribution PCBs are secure. Verify that
the 3 PCBs are fully inserted into their sockets. Plug the system into
the outlet.
Figure 11-4. Circuit Breakers
System Installation
Uncrating the System
11-8
STERRAD® 100 Sterilizer
ASP Service Guide rev. D
Summary of Contents for STERRAD 100
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......