Certification Procedures
Be sure to perform all certification procedure in sequence. This is
particularly important for the heater voltages and temperatures.
F
System Preparation
F
Power Supplies Verification
F
Analog to Digital Set Point Verification
F
High-Low Pressure Range Divider Voltage Verification
F
Baratron Zero Shift Test
F
RF Power Test
F
Leak Back Test
F
Compressor Pressure Switch Verification
F
Cassette Optics Test
F
Injector Pump Floating Guide Check
F
Master Reset
F
Heater Voltages and Temperatures
F
Vaporizer Heater Voltage Verification
F
Door Temperature
F
Chamber Temperature
F
Block 2 Door and Chamber Temperatures
System Preparation
1. Remove the access panels from the control enclosure and apply
power to the enclosure by enabling the safety interlock.
Product Certification
Certification Procedures
13-4
STERRAD® 100 Sterilizer
ASP Service Guide rev. D
Summary of Contents for STERRAD 100
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......