Align Left Guide Rail To Left Frame
On Block 2 devices this alignment procedure is the same, however the
gage is part of the frame assembly.
1. Using gage T.2270 adjust the back of the left guide rail to left frame
upright at top panel bracket location. See the diagram.
2. Tighten all chamber mounting hardware (guide rails and eyebolt).
Using gage T.2266 verify that the alignment of chamber and
left/right guide rail has not changed.
3. Install the cables and screws at the left and right upper door stop
brackets with the flat of the eye toward the center of the machine.
4. Secure with the M5 x 10.0 screws, lock washers and flat washers
previously removed.
5. Secure the 3 panel brackets to maintain a dimension between 483
and 488 mm as measured between the inside edges of the right and
left guide rails.
6. Reinstall the door seal O-ring.
7. If necessary, route the counterweight cable up and over the INNER
groove of the upper right guide rail pulley, and over the OUTER
groove of the counterweight pulley. On Block 2 systems skip this
step. Misalignment is not a problem on Block 2 systems.
Figure 7-3. Align Chamber to Left Guide Rail
Door and Chamber Subsystem
Calibration
7-10
STERRAD® 100 Sterilizer
ASP Service Guide rev D
Summary of Contents for STERRAD 100
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......