screws are used on the sides; the longer M8 Allen screw is on the
rear of the unit. Leave the screws loose.
8. Fasten the rear and front subframes together with 5 M6 Allen screws
flatwasher and lockwashers. Then tighten the M8 Allen screws.
9. Remove the support.
10. Tighten the 3 M8 screws.
Installing the Brackets
1. Fasten the rear bracket onto the anchor bolts using the 3/8" wide flat
washers and the nuts supplied with the anchor bolts.
2. Remove the rubber tipped spindles on the locating pins. Then loosen
the 2 locating pins on the rear bracket. There are 4 mounting bolts
on the bracket, loosen them with a 1/2" box wrench.
3. Loosely fasten the wheel guides onto the unit.
4. If the drilling template was used, it should be completely removed,
including the tape holding it, by this point.
5. Move the STERRAD 100 Sterilizer so that the subframe channels
align with locating pins on the rear seismic bracket.
Figure 11-5. Mounting Diagram
Installing the Seismic Restraints
System Installation
ASP Service Guide rev. D
STERRAD® 100 Sterilizer
11-11
Summary of Contents for STERRAD 100
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......